12600

Tonne Scrap Metal Removed

9500

Tonne Concrete & Brick Recycled

6000

m2 Concrete Replaced

Project Summary

Summary Decommission & Strip Out
Client Toyota Motor Corporation Australia
Schedule 4 Years 2018-2022
Location Altona North, VIC, Australia
Outline Strip out of production plant, equipment and TMCA assets completed to clear 135,000m2 floor area.
Outcome Ausdecom decommissioned/stripped out nominated buildings of all production plant, equipment and Toyota assets from concrete level to the bottom of the roof.

Scope of Work Completed

Strip out of production plant, equipment and TMCA assets completed to clear 135,000m2 floor area.
Works included remediation of conveyor line area, removing pits, backfilling and replacing concrete before returning the buildings to client undamaged and ready for future use.
In May 2018 Ausdecom commenced decommissioning/strip out. Ausdecom mobilised supervision, labour and equipment to strip out the remaining plant and equipment in the Powertrain, Assembly, Resin Shop, Weld Shop and Unit Parts buildings at the Toyota manufacturing site in Altona North.
Over a period of 4 years in the Altona North Toyota facility Ausdecom decommissioned/stripped out nominated buildings (combined total of 84,500m2 floor area) of all production plant, equipment and Toyota assets from concrete level to the bottom of the roof.

http://Ausdecom%20Decommission%20&%20Strip%20Out%20Toyota%20Altona%20North,%20VIC
http://Ausdecom%20Toyota%20Motor%20Corporation%20Australia%20Altona%20North,%20VIC%20Decommission%20&%20Strip%20Out
http://Ausdecom%20Decommission%20&%20Strip%20Out%20Toyota%20Motor%20Corporation%20Australia%20Altona%20North,%20VIC

Works Included:

  • The washing out and backfilling of conveyor line pits (over 8000m3 backfilled)
  • 6000m2 of new concrete was poured over the now backfilled conveyor pits
  • Removing Aircon units and plant decks from the roof and completed reinstatement works of all roof and wall penetrations
  • The removal of two cross over bridges.

“The Toyota Corporate Property Team are proud to call Ausdecom a partner! Since engaging Ausdecom in 2018, they have partnered with us at our Altona site transforming the previous manufacturing facility into a true “Centre of Excellence”. The reason we are so proud to call Ausdecom a partner is because of their passion for safety and the environment above all else. This philosophy resonated with Toyota when we first engaged Ausdecom in our initial works and saw them staying on to decommission more than 50,000m2 of our site and win the complete package of works at the Altona site. When it came to decommissioning there was only Ausdecom! During their time working with Toyota, Ausdecom have undertaken demolition and remediation works over a number of project stages for TMCA between 2018 and 2020. The press shop demolition project completed between September 2020 and October 2021 was the final stage of the demolition campaign at the Altona Site. The Press Shop demolition works involved removal of the above ground building structure, including roof and walls containing asbestos, as well as the below ground civil infrastructure consisting of a scrap pit and tunnel network. During the works Ausdecoms’ communication, advice and support showcased their exceptional skill, knowledge, and quality workmanship. Throughout the project Ausdecom demonstrated innovative solutions, transparency, reliability, and a commitment to safety in every aspect of their work. Ausdecom truly partner with their clients to deliver outstanding results through teamwork and respect.  When it comes to demolition works, Toyota could not provide a more glowing endorsement! On behalf of Toyota, “Thank You:” for all your hard work and making our dreams of creating a ‘Centre of Excellence’ at Altona come true.”

Luke Martin (TMCA representative)